Location UB3 1HA

Old Vinyl Factory, Hayes

Our works package for this development includes bulk excavation and construction of a car park basement, podium and 2 number RC frames (Block A - 8 floors and Block B - 8 floors). Includes surface and foul drainage and services trenches.

Client

Client Icon

Crest Nicholson Regeneration
Value

Value Icon

£3.90m
Engineer

Engineer Icon

Building Design Consultants
Architect

Architect Icon

HGP Architects