Harris Academy, South Norwood
Client:
Wates Group Ltd
Value:
£3.3m
Construction of substructure/heave protected GF slab and post-tensioned superstructure to a new school academy building:
- Contractor designed PT floor plates (8000m2) with extensive high
grade concrete finishes to exposed soffits and stair cores.
Additional works comprised:
- Site infrastructure
- External works
- Hard landscaping
- Contractor designed PT floor plates (8000m2) with extensive high
grade concrete finishes to exposed soffits and stair cores.
Additional works comprised:
- Site infrastructure
- External works
- Hard landscaping